What's Proposed

Faulk Elementary: $11,700,000

Construction of a new elementary school to replace the Faulk Early Childhood campus will accommodate the district’s future growth. A two-story building with a capacity of 750 students to house both Kieberger’s and Faulk’s students. To include a library, gymnasium, cafeteria, with a separate student & bus/service drive drop offs and secured entries for visitors. The new school will have a smaller building footprint with playfield improvements and is expected to open Fall 2018.

 

Aransas Pass High School Gymnasium: $3,800,000

This project consists of building a new 18,800 square foot gymnasium for Aransas Pass High School. The new gymnasium provides a full size UIL gymnasium play area for basketball and volleyball, bleachers, ticket booth and restrooms. The addition will be an ADA accessible gym with seating for 1,000 spectators (500 seats Home side & 500 Seats Visitor side). The existing gym will still stay as it is and be used for some physical education classes, practice space and games.

 

Aransas Pass High School Athletic Fields Snack Bar: $400,000

Construction of a new 1300 square foot snack bar for Aransas Pass High School to be located in-between the football field and softball and baseball fields. The project includes men's and women's restrooms, storage, custodian closet, food preparation and serving windows.

 

All Schools Upgrades: $2,000,000          

Technology infrastructure improvements, vestibules, security cameras, lighting, roof replacement and repair, various walkway canopies and energy efficient central control units will be included in the bond projects.

bd
Website by SchoolMessenger Presence. © 2024 SchoolMessenger Corporation. All rights reserved.